www.use-in-a-sentence.com

English words and Examples of Usage

Example Sentences for "boilers "


Steam boilers may explode.

The boilers are of steel and adapted for a working pressure of 160 lb.

This pump has all the usual connections, so that it can be used for feeding the boilers from the hot well, for filling the fresh water tanks, for pumping from the bilges, or from the sea as a fire engine.

The brine rising quickly through the aperture is pumped into a capacious reservoir, whence it is conveyed into iron boilers for evaporation.

- (1) The Administrator shall by regulation establish annual allowable emission limitations for nitrogen oxides for the types of utility boilers listed below, which limitations shall not exceed the rates listed below: Provided, That the Administrator may set a rate higher than that listed for any type of utility boiler if the Administrator finds that the maximum listed rate for that boiler type cannot be achieved using low NOx burner technology.

For boilers and integrated gasification combined cycle plants, this term does not include undertaking such a program or entering into such an obligation more than 36 months prior to the date on which the unit begins operation.

In this rule, EPA found that emissions from large electric generating units and large industrial boilers and turbines in 12 States and the District of Columbia are significantly contributing to downwind states' ozone nonattainment problems.

Some higher efficiency boilers may have increased flue gas velocities and can result in corrosive flue gas "blow through" to the absorber.

1,3 Often a single absorber will serve multiple boilers and reduce much of the steel that would be required if absorbers had been fed by individual boilers.

is 890 MWe being fed by 2 boilers at Tampa Electric's Big Bend Station.

2 tons of steel per MWe, rather than a combined maximum of 2025 tons for a situation in which the boilers required separate absorbers.

For the Clear Skies Act, EPA's projections reflect that the majority of FGD installations will involve a single absorber unit installation per plant, however, the maximum projected number of scrubbers retrofitted at any facility is three absorber modules serving six boilers with a maximum of 2400 MWe of boiler capacity.

In summary, the total time needed to complete the design, installation, and testing at a typical 500 MWe facility with one FGD unit is 27 months, 32 months at a facility with two boilers being served by a single absorber module, and approximately 36 months at a facility with three absorber modules (six boiler units).

, 500 MWe), and additional efficiencies in incremental labor occur when scheduling multiple units at one facility, particularly when combining multiple boilers into a single absorber.

This produces a conservatively high estimate bounding the uncertainties of labor and how many boilers or units will be combined into a single absorber.

31 more results not shown.
>>>>>>> GO TO ADVANCED VOCABULARY TESTS <<<<<<


English Jokes Newspapers After-life Issues Funny Videos



Academic English Words List and Example Sentences
Example sentences with the boilers , a sentence example for boilers , and how to make boilers in sample sentence, Synonyms and Collocations for boilers how do I use the word boilers in a sentence? How do you spell boilers in a sentence? spelling of boilers


Search Example Sentences for any English Word here ....


Translate Cambridge Dictionary Meaning Longman Dictionary Meaning Macmillan Dictionary Meaning Oxford Dictionary Meaning Collocations Synonyms

Share on Facebook